FundedCost operating policy
FundedCost Methodology
How evidence becomes a deterministic cost projection.
Release-backed facts
What this page is built from
- The model starts with a versioned editorial release.
- Plan fees and trading rules remain separate entities.
- Every material value points to a source observation.
- Content-addressed snapshots prevent silent evidence replacement.
- Unknown cost inputs suppress the headline.
- Stale material inputs suppress dependent outputs.
- Changes are manually verified before updating a public metric.
- Evaluation attempts include verified replacement economics.
- Applicable activation charges are added after simulation.
- Sensitivity is shown through distinct trader profiles.
- Commercial configuration is not imported by the metric module.
- A complete release can be rebuilt deterministically.